Andros Island, Bahamas
Client:
Naval Facilities Engineering Systems Command (NAVFAC) (Tier 1 Subcontract)
Services Provided:
Indoor Environmental
GLE was selected as a Tier 1 subcontractor to provide hazardous materials consulting services in support of the P720 Austere Quarters Project at the Atlantic Undersea Test and Evaluation Center in Andros Island, Bahamas.
The base project scope was pre-demolition asbestos, lead, heavy metals, and hexavalent chromium surveys for Buildings 1204 and 1216; and asbestos and heavy metals surveys for 37 trailers. Based on results of the surveys, additional task orders were issued for abatement project air monitoring and oversight during removal of asbestos-containing materials and heavy metals prior to demolition. GLE provided full-time onsite hazardous materials abatement project monitoring over 2 months.
Andros Island, Bahamas is a remote and sparsely populated island. Access to the facility to conduct unclassified operations was carefully coordinated to maximize available time to conduct field activities.
Subscribe To The GLE Blog