GLE served as the design and construction manager for the environmental remediation and demolition of Building 747 and the East Annex Offices.
GLE has worked with the Miami-Dade Aviation Department (MDAD) since 1991, providing miscellaneous environmental engineering services.
The Florida Mental Health Institute (FMHI) is a two-story 210,000 square foot structure, occupied by over 350 employees.
GLE served as the term environmental consultant for the School Board of Broward County.
This prototypical design for Polk County Schools was developed for severely emotionally disturbed children in grades K-12.
Operating from the University of South Florida’s Tampa campus, the WUSF-TV 16 Broadcast Facility is a public television
The vision for building UF’s Welcome Center evolved from the dramatic need for a new campus bookstore adjacent to the Student Union.
Safety Harbor Middle School was built with the following features: 177,480 Square Feet. 1,489 Student Capacity
GLE provided design services for a new ESE school. This state-of-the-art building was arranged using a finger plan with the entry points
GLE provided design services for a new middle school with the following features:
GLE provided design services for a new middle school which would house 1,500 students. An existing media center remained.
GLE served as the Project Architect for renovations and new construction to 10 buildings on the Mid Florida Tech campus.
GLE served as the Project Architect for the renovation to this facility, including classrooms and the cafeteria (kitchen and dining areas).
GLE served as architect for the additions and renovations of 12 buildings at this campus.
GLE served as Project Architect for the additions and renovations of four of the five buildings on the campus.
GLE provided design for the restroom renovation of eight buildings, including a portion of the on-site sanitary sewer infrastructure.
Responsible for the design and permitting for a new 30,000 square foot Transmission Operations Center building and site improvements.
GLE designed the renovation of the Administration Building, Fleet Building and Canopy at the Duke Energy facility in Wildwood, FL.
The Eustis line/warehouse serves as an office and warehouse. The expansion consisted of approximately 2,400 square feet...
GLE provided design construction documents for multiple roof replacements at the Stennis Space Center.
GLE provided design services for accessibility upgrades at MacDill Air Force Base. The scope of work included an ADA
GLE provided design services for the re-roofing of nine buildings at MacDill Air Force Base.
GLE provided design services for the renovation of 16 restrooms. The project included replacement of the sewer lines into the buildings.
GLE has served as the environmental consultant and remediation contractor for the Tampa Housing Authority (THA) under an IDIQ contract.
GLE completed the development of a community center housing several services, including a police sub-station...
GLE completed the design for the renovation of the Community Center. GLE’s design for the Community Center
GLE completed the design for the renovation of Tuttle Apartments. A feasibility study was initially completed by GLE
GLE provided design and construction administration services for the complete interior and exterior renovations...
GLE completed the design of this new 28 apartment home community for the Sarasota Housing Funding Corporation.
As part of an A/E Term Contract, GLE completed comprehensive modernization renovations for the McCown Towers
GLE served as the facilities consultant for more than 15 public housing authorities (PHAs) throughout Florida.
The project consists of the renovation of the existing choir ministry space within the Nave of the Church.
The project consists of the expansion of the existing church from 700 seats to over 900 seats.
This project consisted of the renovations of the existing Narthex and Nave, and converting an existing meeting room...
GLE completed demolition of The Haven’s existing structure within the campus and the full permitting and design for their new facility.
GLE provided design and facilities management services for Verizon Wireless, one of the nation’s largest cellular service providers.
GLE provided design services for The Capstone Group’s SouthTown Center in Tampa, FL. This prime office/retail
This 35,000 square-foot New Tampa YMCA recreational center is located in the Tampa Palms area.
The St. Petersburg Times consolidated its two Hernando County offices under one roof with a new 30,000-square-foot
After purchasing a Catholic church in north Tampa, the Bob Sierra YMCA called upon GLE to complete an evaluation ...
GLE performed an in-depth building envelope, IAQ, and water intrusion study for the 100,000+ sq. ft. Lake County Courthouse.
GLE completed design services for Logan Laboratory, a renovation and addition project with a total construction cost of $3,700,000.
Shortly after completion of this five-story courthouse building, problems developed involving the building envelope.
The renovation of a landmark 10-story downtown office building into the new headquarters for 10 departments of Pinellas ...
GLE provided design for a new Mosquito and Aquatic Weed Control Facility. The facility included a 4,500 SF administrative...
Museum of Science & Industry: GLE completed comprehensive building envelope improvements to both the east and west wings...
This project consists of the design of a new facility for the City of West Melbourne to house the following departments
The McNulty Station is an office building complex located in downtown St. Petersburg. It is comprised of three recycled buildings...
GLE was selected to provide Architectural and Engineering Services for an approximate 18,000 square foot (SF) City Hall office building.