GLE Associates, Inc.
Facebook
Twitter
LinkedIn
888.453.4531
  • About
    • Locations
  • Services
  • Projects
  • Federal
  • Careers
  • Our Blog
  • Contact us
  • ENVIRONMENTAL, INDUSTRIAL HYGIENE, FACILITIES & CONSTRUCTION CONSULTANTS
    PROJECTS
  • ALL
  • Aviation
  • Corporate
  • Federal
  • Education
  • Financial
  • Government
  • Healthcare
  • Industrial
  • Public Housing
  • Religious
  • Transportation
  • Utilities
  • ALL
  • Architecture
  • Building Forensics
  • Catastrophe & Insurance
  • Construction Consulting
  • Indoor Environmental
  • Industrial Hygiene
  • MEP Engineering
  • Outdoor Environmental
  • Property Condition Assessment
Sort Descending
  • San Bernardino International Airport (SBIAA)

    5 May, 2016

    GLE served as the design and construction manager for the environmental remediation and demolition of Building 747 and the East Annex Offices.

  • Miami International Airport

    5 May, 2016

    GLE has worked with the Miami-Dade Aviation Department (MDAD) since 1991, providing miscellaneous environmental engineering services.

  • Florida Mental Health Institute

    5 May, 2016

    The Florida Mental Health Institute (FMHI) is a two-story 210,000 square foot structure, occupied by over 350 employees.

  • Broward County Public Schools

    5 May, 2016

    GLE served as the term environmental consultant for the School Board of Broward County.

  • Karen Siegel Academy ESE School

    5 May, 2016

    This prototypical design for Polk County Schools was developed for severely emotionally disturbed children in grades K-12.

  • WUSF Broadcast Facility

    5 May, 2016

    Operating from the University of South Florida’s Tampa campus, the WUSF-TV 16 Broadcast Facility is a public television

  • University of South Florida MLK Plaza Design

    5 May, 2016

    GLE designed A/E Improvements for MLK Plaza.

  • University of Florida Bookstore & Welcome Center

    5 May, 2016

    The vision for building UF’s Welcome Center evolved from the dramatic need for a new campus bookstore adjacent to the Student Union.

  • Safety Harbor Middle School

    5 May, 2016

    Safety Harbor Middle School was built with the following features: 177,480 Square Feet. 1,489 Student Capacity

  • Nina Harris ESE Center

    5 May, 2016

    GLE provided design services for a new ESE school. This state-of-the-art building was arranged using a finger plan with the entry points

  • Dunedin Middle School

    5 May, 2016

    GLE provided design services for a new middle school with the following features:

  • Azalea Middle School

    5 May, 2016

    GLE provided design services for a new middle school which would house 1,500 students. An existing media center remained.

  • Mid Florida Technical Center

    5 May, 2016

    GLE served as the Project Architect for renovations and new construction to 10 buildings on the Mid Florida Tech campus.

  • Pine Castle Elementary School

    5 May, 2016

    GLE served as the Project Architect for the renovation to this facility, including classrooms and the cafeteria (kitchen and dining areas).

  • Oak Ridge High School

    5 May, 2016

    GLE served as architect for the additions and renovations of 12 buildings at this campus.

  • Conway Middle School

    5 May, 2016

    GLE served as Project Architect for the additions and renovations of four of the five buildings on the campus.

  • Madeira Beach Fundamental Elementary School

    5 May, 2016

    GLE provided design for the restroom renovation of eight buildings, including a portion of the on-site sanitary sewer infrastructure.

  • Duke Energy, Transmission Operations Center Building

    6 May, 2016

    Responsible for the design and permitting for a new 30,000 square foot Transmission Operations Center building and site improvements.

  • Duke Energy, Wildwood Facility Administration Building, Fleet Building & Canopy

    6 May, 2016

    GLE designed the renovation of the Administration Building, Fleet Building and Canopy at the Duke Energy facility in Wildwood, FL.

  • Duke Energy Eustis Canopy Addition & Interior Renovations

    6 May, 2016

    The Eustis line/warehouse serves as an office and warehouse. The expansion consisted of approximately 2,400 square feet...

  • Stennis Space Center Roof Replacement

    6 May, 2016

    GLE provided design construction documents for multiple roof replacements at the Stennis Space Center.

  • MacDill Air Force Base Wounded Warrior Building 654 & Marina Upgrades

    6 May, 2016

    GLE provided design services for accessibility upgrades at MacDill Air Force Base. The scope of work included an ADA

  • MacDill Air Force Base Basewide Roof Repair

    6 May, 2016

    GLE provided design services for the re-roofing of nine buildings at MacDill Air Force Base.

  • MacDill Air Force Base Hangar Bathroom Repair, Design Build Renovation

    6 May, 2016

    GLE provided design services for the renovation of 16 restrooms. The project included replacement of the sewer lines into the buildings.

  • Tampa Housing Authority

    6 May, 2016

    GLE has served as the environmental consultant and remediation contractor for the Tampa Housing Authority (THA) under an IDIQ contract.

  • Williams Center

    6 May, 2016

    GLE completed the development of a community center housing several services, including a police sub-station...

  • Winter Haven Housing Authority

    6 May, 2016

    GLE completed the design for the renovation of the Community Center. GLE’s design for the Community Center

  • Tuttle Apartments

    6 May, 2016

    GLE completed the design for the renovation of Tuttle Apartments. A feasibility study was initially completed by GLE

  • Rosemary Park Condominiums

    6 May, 2016

    GLE provided design and construction administration services for the complete interior and exterior renovations...

  • King Stone Townhomes

    6 May, 2016

    GLE completed the design of this new 28 apartment home community for the Sarasota Housing Funding Corporation.

  • McCown Towers Annex Building

    6 May, 2016

    As part of an A/E Term Contract, GLE completed comprehensive modernization renovations for the McCown Towers

  • Physical Needs Assessments and Remediation Design for Various Florida Public Housing Authorities

    6 May, 2016

    GLE served as the facilities consultant for more than 15 public housing authorities (PHAs) throughout Florida.

  • Espiritu Santo

    6 May, 2016

    The project consists of the renovation of the existing choir ministry space within the Nave of the Church.

  • Christ the King

    6 May, 2016

    The project consists of the expansion of the existing church from 700 seats to over 900 seats.

  • St. Paul Catholic Church Renovations

    6 May, 2016

    This project consisted of the renovations of the existing Narthex and Nave, and converting an existing meeting room...

  • The Haven

    6 May, 2016

    GLE completed demolition of The Haven’s existing structure within the campus and the full permitting and design for their new facility.

  • Verizon Wireless

    6 May, 2016

    GLE provided design and facilities management services for Verizon Wireless, one of the nation’s largest cellular service providers.

  • The Capstone Group SouthTown Center

    6 May, 2016

    GLE provided design services for The Capstone Group’s SouthTown Center in Tampa, FL. This prime office/retail

  • New Tampa YMCA

    6 May, 2016

    This 35,000 square-foot New Tampa YMCA recreational center is located in the Tampa Palms area.

  • Hernando Pasco Times Building

    6 May, 2016

    The St. Petersburg Times consolidated its two Hernando County offices under one roof with a new 30,000-square-foot

  • Bob Sierra YMCA Youth & Family Center

    6 May, 2016

    After purchasing a Catholic church in north Tampa, the Bob Sierra YMCA called upon GLE to complete an evaluation ...

  • Lake County Courthouse

    6 May, 2016

    GLE performed an in-depth building envelope, IAQ, and water intrusion study for the 100,000+ sq. ft. Lake County Courthouse.

  • Logan Laboratory Renovations & Additions

    6 May, 2016

    GLE completed design services for Logan Laboratory, a renovation and addition project with a total construction cost of $3,700,000.

  • Judicial Center Building

    6 May, 2016

    Shortly after completion of this five-story courthouse building, problems developed involving the building envelope.

  • Pinellas County 501 Building

    6 May, 2016

    The renovation of a landmark 10-story downtown office building into the new headquarters for 10 departments of Pinellas ...

  • Mosquito and Aquatic Weed Control Facility

    6 May, 2016

    GLE provided design for a new Mosquito and Aquatic Weed Control Facility. The facility included a 4,500 SF administrative...

  • Hillsborough County

    6 May, 2016

    Museum of Science & Industry: GLE completed comprehensive building envelope improvements to both the east and west wings...

  • City of West Melbourne Public Works Building

    6 May, 2016

    This project consists of the design of a new facility for the City of West Melbourne to house the following departments

  • McNulty Station

    6 May, 2016

    The McNulty Station is an office building complex located in downtown St. Petersburg. It is comprised of three recycled buildings...

  • City of Cape Canaveral City Hall

    11 May, 2016

    GLE was selected to provide Architectural and Engineering Services for an approximate 18,000 square foot (SF) City Hall office building.

Services

  • Indoor Environmental
  • Outdoor Environmental
  • Industrial Hygiene
  • Construction Consulting
  • Building Forensics
  • Property Condition Assessment
  • Catastrophe & Insurance Services
  • Architecture

Site Links

  • Home
  • Our Blog
  • About
  • Career Opportunities
  • Contact us
  • Locations

Learn More

Subscribe To The GLE Blog
  • This field is for validation purposes and should be left unchanged.
© 2022 GLE Associates, Inc. All Rights Reserved. AR 0007729; PE RY5483; Asbestos ZA 0000034; PG 1737
Design & Developed by TranquilBlue