GLE provided design services for accessibility upgrades at MacDill Air Force Base.
GLE was responsible for the design and permitting for the site improvements to support Duke Energy’s new 13,000 square foot Operations Building
GLE designed the renovation of the Administration Building, Fleet Building and Canopy at the Duke Energy facility in Wildwood, FL.
Responsible for the design and permitting for a new 30,000 square foot Transmission Operations Center building and site improvements.
GLE provided design for the restroom renovation of eight buildings, including a portion of the on-site sanitary sewer infrastructure.
GLE completed full design and permitting services for corrective measures to eliminate flooding within the existing recreation fields
GLE served as Project Architect for the additions and renovations of four of the five buildings on the campus.
GLE served as the Project Architect for the renovation to this facility, including classrooms and the cafeteria (kitchen and dining areas).
GLE provided design services for a new middle school which would house 1,500 students. An existing media center remained.
GLE provided design services for a new middle school with the following features: