GLE Associates, Inc.
Facebook
LinkedIn
888.453.4531
  • About
    • Locations
  • Services
  • Projects
  • Federal
  • Careers
  • Our Blog
  • Contact us
  • ENVIRONMENTAL, INDUSTRIAL HYGIENE, FACILITIES & CONSTRUCTION CONSULTANTS
    PROJECTS
  • ALL
  • Aviation
  • Corporate
  • Federal
  • Education
  • Financial
  • Government
  • Healthcare
  • Industrial
  • Public Housing
  • Religious
  • Transportation
  • Utilities
  • ALL
  • Architecture
  • Building Forensics
  • Catastrophe & Insurance
  • Construction Consulting
  • Indoor Environmental
  • Industrial Hygiene
  • MEP Engineering
  • Outdoor Environmental
  • Property Condition Assessment
Sort Descending
  • Advent Health Orlando

    May 5, 2016

    GLE has provided various environmental services for the Florida Hospital in Orlando. Services include asbestos consulting, indoor air quality.

  • Malcom Randall Veterans Affairs Medical Center

    May 4, 2016

    GLE has provided hazardous materials consulting services on over 60 renovation projects at the VA Medical Center.

  • UF Health Jacksonville (Formerly Shands Jacksonville)

    May 3, 2016

    GLE has served as an environmental engineering services consultant for UF Health Jacksonville since 2004, successfully completing over 850 projects.

  • San Bernardino International Airport

    May 5, 2016

    GLE served as the design and construction manager for the environmental remediation and demolition of Building 747 and the East Annex Offices.

  • Miami International Airport

    May 5, 2016

    GLE has worked with the Miami-Dade Aviation Department (MDAD) since 1991, providing miscellaneous environmental engineering services.

  • Federal Aviation Administration (FAA)

    May 5, 2016

    GLE has provided asbestos and lead-based paint consulting for FAA facilities throughout Florida and Georgia.

  • Florida Mental Health Institute

    May 5, 2016

    The Florida Mental Health Institute (FMHI) is a two-story 210,000 square foot structure, occupied by over 350 employees.

  • St. Petersburg College

    May 5, 2016

    GLE has served as the environmental consultant for approximately 300 projects of various scopes and magnitudes.

  • Broward County Public Schools

    May 5, 2016

    GLE served as the term environmental consultant for the School Board of Broward County.

  • Starkey Elementary School

    May 5, 2016

    GLE completed full design and permitting services for corrective measures to eliminate flooding within the existing recreation fields

  • Confidential National Banking Client Property Condition Assessment

    May 6, 2016

    GLE completed a Property Condition Assessment (PCA) Report for the Banking Client’s Tower located in downtown St.

  • Construction Consulting Services for Multiple Financial Institutions

    May 6, 2016

    GLE served as a construction services representative performing plan and cost reviews and inspections

  • Florida Housing Finance Corporation Projects

    May 6, 2016

    GLE provided construction consulting and construction monitoring services associated with Florida Housing Finance Corporation’s (FHFC)

  • Turkey Point & St. Lucie Nuclear Plants

    May 6, 2016

    GLE has supervised the asbestos abatement/consulting at the Turkey Point Nuclear Plant since 1991.

  • Jacksonville Electric Authority

    May 6, 2016

    GLE has served as JEA’s Industrial Hygiene and Safety consultant since 2006. Through this term contract...

  • Riviera Beach Power Plant

    May 6, 2016

    GLE completed a pre-demolition asbestos survey at the FP&L Riviera Beach Power Plant. GLE inspected over 30 buildings in less than 15 days.

  • Duke Energy Inverness Operations Center Building

    May 6, 2016

    GLE was responsible for the design and permitting for the site improvements to support Duke Energy’s new 13,000 square foot Operations Building

  • Firing Range at Kings Bay Naval Station

    May 6, 2016

    Universal Supplies & Services, Inc. contracted GLE to perform an industrial hygiene assessment for the east range of an indoor firing range.

  • Florida Army National Guard Armory – Indoor Firing Ranges

    May 6, 2016

    The Florida Army National Guard contacted GLE to perform turn-key bullet trap cleanup for 20 armory sites located throughout Florida.

  • MacDill Air Force Base Wounded Warrior Building 654 & Marina Upgrades

    May 6, 2016

    GLE provided design services for accessibility upgrades at MacDill Air Force Base.

  • MacDill Air Force Base Basewide Roof Repair

    May 6, 2016

    GLE provided design services for the re-roofing of nine buildings at MacDill Air Force Base.

  • MacDill Air Force Base Hangar Bathroom Repair, Design Build Renovation

    May 6, 2016

    GLE provided design services for the renovation of 16 restrooms. The project included replacement of the sewer lines into the buildings.

  • Tampa Housing Authority

    May 6, 2016

    GLE has served as the environmental consultant and remediation contractor for the Tampa Housing Authority (THA) under an IDIQ contract.

  • Williams Center

    May 6, 2016

    GLE completed the development of a community center housing several services, including a police sub-station...

  • Winter Haven Housing Authority

    May 6, 2016

    GLE completed the design for the renovation of the Community Center. GLE’s design for the Community Center

  • Tuttle Apartments

    May 6, 2016

    GLE completed the design for the renovation of Tuttle Apartments. A feasibility study was initially completed by GLE

  • Rosemary Park Condominiums

    May 6, 2016

    GLE provided design and construction administration services for the complete interior and exterior renovations...

  • King Stone Townhomes

    May 6, 2016

    GLE completed the design of this new 28 apartment home community for the Sarasota Housing Funding Corporation.

  • McCown Towers Annex Building

    May 6, 2016

    As part of an A/E Term Contract, GLE completed comprehensive modernization renovations for the McCown Towers

  • Physical Needs Assessments and Remediation Design for Various Florida Public Housing Authorities

    May 6, 2016

    GLE served as the facilities consultant for more than 15 public housing authorities (PHAs) throughout Florida.

  • HUD’s RAD and GPNA Physical Needs Assessment (PNA) Programs

    May 6, 2016

    GLE provided professional consulting services associated with HUD’s Green Physical Needs Assessment

  • Espiritu Santo

    May 6, 2016

    The project consists of the renovation of the existing choir ministry space within the Nave of the Church.

  • Christ the King

    May 6, 2016

    The project consists of the expansion of the existing church from 700 seats to over 900 seats.

  • St. Paul Catholic Church Renovations

    May 6, 2016

    This project consisted of the renovations of the existing Narthex and Nave, and converting an existing meeting room...

  • The Haven

    May 6, 2016

    GLE completed demolition of The Haven’s existing structure within the campus and the full permitting and design for their new facility.

  • Hurricane Disaster Response

    May 6, 2016

    GLE serviced this contract involving hundreds of water and mold assessments of properties located throughout the Southeast.

  • Commerce Park Drainage Renovations

    May 6, 2016

    After decades of flooding that periodically affected a commerce park, GLE was requested to assess the flooding and to remedial options.

  • Verizon Wireless

    May 6, 2016

    GLE provided design and facilities management services for Verizon Wireless, one of the nation’s largest cellular service providers.

  • The Capstone Group SouthTown Center

    May 6, 2016

    GLE provided design services for The Capstone Group’s SouthTown Center in Tampa, FL. This prime office/retail

  • New Tampa YMCA

    May 6, 2016

    This 35,000 square-foot New Tampa YMCA recreational center is located in the Tampa Palms area.

  • Hernando Pasco Times Building

    May 6, 2016

    The St. Petersburg Times consolidated its two Hernando County offices under one roof with a new 30,000-square-foot

  • Bob Sierra YMCA Youth & Family Center

    May 6, 2016

    After purchasing a Catholic church in north Tampa, the Bob Sierra YMCA called upon GLE to complete an evaluation ...

  • Palatka Pulp and Paper Mill

    May 6, 2016

    GLE was awarded a five year Master Service Agreement for Environmental Services with the Georgia-Pacific Corporation

  • Sam M. Gibbons Courthouse

    May 6, 2016

    GLE performed indoor air quality and mold consulting services at the Sam M. Gibbons U.S. Federal Courthouse.

  • Manatee County Courthouse

    May 6, 2016

    GLE performed a comprehensive indoor air quality and HVAC assessment for the historic court house building.

  • Manatee County

    May 6, 2016

    GLE has held an environmental term contract with Manatee County since 2000. Services include environmental engineering...

  • Lake County Courthouse

    May 6, 2016

    GLE performed an in-depth building envelope, IAQ, and water intrusion study for the 100,000+ sq. ft. Lake County Courthouse.

  • Historic US Courthouse

    May 6, 2016

    GLE was requested to perform an extensive evaluation of the facility asbestos-containing materials (ACM) and lead-based paint (LBP).

  • Florida Department of Environmental Protection

    May 6, 2016

    GLE has performed hundreds of limited and full site assessments, site monitoring, and cleanup of sites in the State of Florida

  • The Ca’D’Zan – Ringling Museum

    May 6, 2016

    The Ca’D’Zan (“House of John”) is the former residence of John and Mable Ringling located at the current site of the Ringling Museum

  • Broward County Courthouse

    May 6, 2016

    Broward County contracted GLE to perform a comprehensive IAQ and Water Intrusion study for the 250,000 SF Broward County...

  • Logan Laboratory Renovations & Additions

    May 6, 2016

    GLE completed design services for Logan Laboratory, a renovation and addition project with a total construction cost of $3,700,000.

  • Judicial Center Building

    May 6, 2016

    Shortly after completion of this five-story courthouse building, problems developed involving the building envelope.

  • Hillsborough County

    May 6, 2016

    Museum of Science & Industry: GLE completed comprehensive building envelope improvements to both the east and west wings...

  • FDOT Districts: 1, 2, 5, 6, 7, and the Turnpike Division

    May 6, 2016

    GLE has served as the asbestos consultant for various FDOT districts throughout the State of Florida.

  • National Guard West Region Industrial Hygiene Assessments

    July 13, 2023

  • USACE Jacksonville Broward County Segment II – Endangered Species Act Coral Survey and Relocation Services

    July 13, 2023

    GLE was awarded the task order to perform diver based Endangered Species Act (ESA) coral relocations for the U.S. Army Corps of Engineers (USACE), Jacksonville District (SAJ).

  • Innovare

    May 15, 2024

    GLE provided construction consulting and construction monitoring services associated with Florida Housing Finance Corporation’s (FHFC)

  • USACE Jacksonville District – Pinellas County Non-Breeding Shorebird Survey

    January 24, 2025

    GLE was awarded the task order to perform diver based Endangered Species Act (ESA) coral relocations for the U.S. Army Corps of Engineers (USACE), Jacksonville District (SAJ).

Services

  • Indoor Environmental
  • Outdoor Environmental
  • Industrial Hygiene
  • Construction Consulting
  • Building Forensics
  • Property Condition Assessment
  • Catastrophe & Insurance Services

Site Links

  • Home
  • Our Blog
  • About
  • Career Opportunities
  • Contact us
  • Locations

Learn More

Subscribe To The GLE Blog

  • This field is for validation purposes and should be left unchanged.
© 2022 GLE Associates, Inc. All Rights Reserved. AR 0007729; PE RY5483; Asbestos ZA 0000034; PG 1737
Design & Developed by TranquilBlue