GLE Associates, Inc.
Facebook
LinkedIn
888.453.4531
  • About
    • Locations
  • Services
  • Projects
  • Federal
  • Careers
  • Our Blog
  • Contact us
  • ENVIRONMENTAL, INDUSTRIAL HYGIENE, FACILITIES & CONSTRUCTION CONSULTANTS
    PROJECTS
  • ALL
  • Aviation
  • Corporate
  • Federal
  • Education
  • Financial
  • Government
  • Healthcare
  • Industrial
  • Public Housing
  • Religious
  • Transportation
  • Utilities
  • ALL
  • Architecture
  • Building Forensics
  • Catastrophe & Insurance
  • Construction Consulting
  • Indoor Environmental
  • Industrial Hygiene
  • MEP Engineering
  • Outdoor Environmental
  • Property Condition Assessment
Sort Descending
  • Advent Health Orlando

    5 May, 2016

    GLE has provided various environmental services for the Florida Hospital in Orlando. Services include asbestos consulting, indoor air quality.

  • Malcom Randall Veterans Affairs Medical Center

    4 May, 2016

    GLE has provided hazardous materials consulting services on over 60 renovation projects at the VA Medical Center.

  • UF Health Jacksonville (Formerly Shands Jacksonville)

    3 May, 2016

    GLE has served as an environmental engineering services consultant for UF Health Jacksonville since 2004, successfully completing over 850 projects.

  • San Bernardino International Airport (SBIAA)

    5 May, 2016

    GLE served as the design and construction manager for the environmental remediation and demolition of Building 747 and the East Annex Offices.

  • Miami International Airport

    5 May, 2016

    GLE has worked with the Miami-Dade Aviation Department (MDAD) since 1991, providing miscellaneous environmental engineering services.

  • Federal Aviation Administration (FAA)

    5 May, 2016

    GLE has provided asbestos and lead-based paint consulting for FAA facilities throughout Florida and Georgia.

  • Florida Mental Health Institute

    5 May, 2016

    The Florida Mental Health Institute (FMHI) is a two-story 210,000 square foot structure, occupied by over 350 employees.

  • St. Petersburg College

    5 May, 2016

    GLE has served as the environmental consultant for approximately 300 projects of various scopes and magnitudes.

  • Broward County Public Schools

    5 May, 2016

    GLE served as the term environmental consultant for the School Board of Broward County.

  • Karen Siegel Academy ESE School

    5 May, 2016

    This prototypical design for Polk County Schools was developed for severely emotionally disturbed children in grades K-12.

  • WUSF Broadcast Facility

    5 May, 2016

    Operating from the University of South Florida’s Tampa campus, the WUSF-TV 16 Broadcast Facility is a public television

  • University of South Florida MLK Plaza Design

    5 May, 2016

    GLE designed A/E Improvements for MLK Plaza.

  • University of Florida Bookstore & Welcome Center

    5 May, 2016

    The vision for building UF’s Welcome Center evolved from the dramatic need for a new campus bookstore adjacent to the Student Union.

  • Safety Harbor Middle School

    5 May, 2016

    Safety Harbor Middle School was built with the following features: 177,480 Square Feet. 1,489 Student Capacity

  • Nina Harris ESE Center

    5 May, 2016

    GLE provided design services for a new ESE school. This state-of-the-art building was arranged using a finger plan with the entry points

  • Dunedin Middle School

    5 May, 2016

    GLE provided design services for a new middle school with the following features:

  • Azalea Middle School

    5 May, 2016

    GLE provided design services for a new middle school which would house 1,500 students. An existing media center remained.

  • Mid Florida Technical Center

    5 May, 2016

    GLE served as the Project Architect for renovations and new construction to 10 buildings on the Mid Florida Tech campus.

  • Pine Castle Elementary School

    5 May, 2016

    GLE served as the Project Architect for the renovation to this facility, including classrooms and the cafeteria (kitchen and dining areas).

  • Oak Ridge High School

    5 May, 2016

    GLE served as architect for the additions and renovations of 12 buildings at this campus.

  • Conway Middle School

    5 May, 2016

    GLE served as Project Architect for the additions and renovations of four of the five buildings on the campus.

  • Starkey Elementary School

    5 May, 2016

    GLE completed full design and permitting services for corrective measures to eliminate flooding within the existing recreation fields

  • Madeira Beach Fundamental Elementary School

    5 May, 2016

    GLE provided design for the restroom renovation of eight buildings, including a portion of the on-site sanitary sewer infrastructure.

  • Confidential National Banking Client Property Condition Assessment

    6 May, 2016

    GLE completed a Property Condition Assessment (PCA) Report for the Banking Client’s Tower located in downtown St.

  • Construction Consulting Services for Multiple Financial Institutions

    6 May, 2016

    GLE served as a construction services representative performing plan and cost reviews and inspections

  • Florida Housing Finance Corporation Projects

    6 May, 2016

    GLE provided construction consulting and construction monitoring services associated with Florida Housing Finance Corporation’s (FHFC)

  • Turkey Point & St. Lucie Nuclear Plants

    6 May, 2016

    GLE has supervised the asbestos abatement/consulting at the Turkey Point Nuclear Plant since 1991.

  • Jacksonville Electric Authority

    6 May, 2016

    GLE has served as JEA’s Industrial Hygiene and Safety consultant since 2006. Through this term contract...

  • Riviera Beach Power Plant

    6 May, 2016

    GLE completed a pre-demolition asbestos survey at the FP&L Riviera Beach Power Plant. GLE inspected over 30 buildings in less than 15 days.

  • Duke Energy, Transmission Operations Center Building

    6 May, 2016

    Responsible for the design and permitting for a new 30,000 square foot Transmission Operations Center building and site improvements.

  • Duke Energy, Wildwood Facility Administration Building, Fleet Building & Canopy

    6 May, 2016

    GLE designed the renovation of the Administration Building, Fleet Building and Canopy at the Duke Energy facility in Wildwood, FL.

  • Duke Energy Inverness Operations Center Building

    6 May, 2016

    GLE was responsible for the design and permitting for the site improvements to support Duke Energy’s new 13,000 square foot Operations Building

  • Duke Energy Eustis Canopy Addition & Interior Renovations

    6 May, 2016

    The Eustis line/warehouse serves as an office and warehouse. The expansion consisted of approximately 2,400 square feet...

  • Firing Range at Kings Bay Naval Station

    6 May, 2016

    Universal Supplies & Services, Inc. contracted GLE to perform an industrial hygiene assessment for the east range of an indoor firing range.

  • Florida Army National Guard Armory – Indoor Firing Ranges

    6 May, 2016

    The Florida Army National Guard contacted GLE to perform turn-key bullet trap cleanup for 20 armory sites located throughout Florida.

  • Stennis Space Center Roof Replacement

    6 May, 2016

    GLE provided design construction documents for multiple roof replacements at the Stennis Space Center.

  • MacDill Air Force Base Wounded Warrior Building 654 & Marina Upgrades

    6 May, 2016

    GLE provided design services for accessibility upgrades at MacDill Air Force Base.

  • MacDill Air Force Base Basewide Roof Repair

    6 May, 2016

    GLE provided design services for the re-roofing of nine buildings at MacDill Air Force Base.

  • MacDill Air Force Base Hangar Bathroom Repair, Design Build Renovation

    6 May, 2016

    GLE provided design services for the renovation of 16 restrooms. The project included replacement of the sewer lines into the buildings.

  • Tampa Housing Authority

    6 May, 2016

    GLE has served as the environmental consultant and remediation contractor for the Tampa Housing Authority (THA) under an IDIQ contract.

  • Williams Center

    6 May, 2016

    GLE completed the development of a community center housing several services, including a police sub-station...

  • Winter Haven Housing Authority

    6 May, 2016

    GLE completed the design for the renovation of the Community Center. GLE’s design for the Community Center

  • Tuttle Apartments

    6 May, 2016

    GLE completed the design for the renovation of Tuttle Apartments. A feasibility study was initially completed by GLE

  • Rosemary Park Condominiums

    6 May, 2016

    GLE provided design and construction administration services for the complete interior and exterior renovations...

  • King Stone Townhomes

    6 May, 2016

    GLE completed the design of this new 28 apartment home community for the Sarasota Housing Funding Corporation.

  • McCown Towers Annex Building

    6 May, 2016

    As part of an A/E Term Contract, GLE completed comprehensive modernization renovations for the McCown Towers

  • Physical Needs Assessments and Remediation Design for Various Florida Public Housing Authorities

    6 May, 2016

    GLE served as the facilities consultant for more than 15 public housing authorities (PHAs) throughout Florida.

  • HUD’s RAD and GPNA Physical Needs Assessment (PNA) Programs

    6 May, 2016

    GLE provided professional consulting services associated with HUD’s Green Physical Needs Assessment

  • Espiritu Santo

    6 May, 2016

    The project consists of the renovation of the existing choir ministry space within the Nave of the Church.

  • Christ the King

    6 May, 2016

    The project consists of the expansion of the existing church from 700 seats to over 900 seats.

  • St. Paul Catholic Church Renovations

    6 May, 2016

    This project consisted of the renovations of the existing Narthex and Nave, and converting an existing meeting room...

  • The Haven

    6 May, 2016

    GLE completed demolition of The Haven’s existing structure within the campus and the full permitting and design for their new facility.

  • Hurricane Disaster Response

    6 May, 2016

    GLE serviced this contract involving hundreds of water and mold assessments of properties located throughout the Southeast.

  • Commerce Park Drainage Renovations

    6 May, 2016

    After decades of flooding that periodically affected a commerce park, GLE was requested to assess the flooding and to remedial options.

  • Verizon Wireless

    6 May, 2016

    GLE provided design and facilities management services for Verizon Wireless, one of the nation’s largest cellular service providers.

  • The Capstone Group SouthTown Center

    6 May, 2016

    GLE provided design services for The Capstone Group’s SouthTown Center in Tampa, FL. This prime office/retail

  • New Tampa YMCA

    6 May, 2016

    This 35,000 square-foot New Tampa YMCA recreational center is located in the Tampa Palms area.

  • Hernando Pasco Times Building

    6 May, 2016

    The St. Petersburg Times consolidated its two Hernando County offices under one roof with a new 30,000-square-foot

  • Bob Sierra YMCA Youth & Family Center

    6 May, 2016

    After purchasing a Catholic church in north Tampa, the Bob Sierra YMCA called upon GLE to complete an evaluation ...

  • Palatka Pulp and Paper Mill

    6 May, 2016

    GLE was awarded a five year Master Service Agreement for Environmental Services with the Georgia-Pacific Corporation

  • Sam M. Gibbons Courthouse

    6 May, 2016

    GLE performed indoor air quality and mold consulting services at the Sam M. Gibbons U.S. Federal Courthouse.

  • Manatee County Courthouse

    6 May, 2016

    GLE performed a comprehensive indoor air quality and HVAC assessment for the historic court house building.

  • Manatee County

    6 May, 2016

    GLE has held an environmental term contract with Manatee County since 2000. Services include environmental engineering...

  • Lake County Courthouse

    6 May, 2016

    GLE performed an in-depth building envelope, IAQ, and water intrusion study for the 100,000+ sq. ft. Lake County Courthouse.

  • Historic US Courthouse

    6 May, 2016

    GLE was requested to perform an extensive evaluation of the facility asbestos-containing materials (ACM) and lead-based paint (LBP).

  • Florida Department of Environmental Protection

    6 May, 2016

    GLE has performed hundreds of limited and full site assessments, site monitoring, and cleanup of sites in the State of Florida

  • The Ca’D’Zan – Ringling Museum

    6 May, 2016

    The Ca’D’Zan (“House of John”) is the former residence of John and Mable Ringling located at the current site of the Ringling Museum

  • Broward County Courthouse

    6 May, 2016

    Broward County contracted GLE to perform a comprehensive IAQ and Water Intrusion study for the 250,000 SF Broward County...

  • Logan Laboratory Renovations & Additions

    6 May, 2016

    GLE completed design services for Logan Laboratory, a renovation and addition project with a total construction cost of $3,700,000.

  • Judicial Center Building

    6 May, 2016

    Shortly after completion of this five-story courthouse building, problems developed involving the building envelope.

  • Pinellas County 501 Building

    6 May, 2016

    The renovation of a landmark 10-story downtown office building into the new headquarters for 10 departments of Pinellas ...

  • Mosquito and Aquatic Weed Control Facility

    6 May, 2016

    GLE provided design for a new Mosquito and Aquatic Weed Control Facility. The facility included a 4,500 SF administrative...

  • Hillsborough County

    6 May, 2016

    Museum of Science & Industry: GLE completed comprehensive building envelope improvements to both the east and west wings...

  • City of West Melbourne Public Works Building

    6 May, 2016

    This project consists of the design of a new facility for the City of West Melbourne to house the following departments

  • McNulty Station

    6 May, 2016

    The McNulty Station is an office building complex located in downtown St. Petersburg. It is comprised of three recycled buildings...

  • FDOT Districts: 1, 2, 5, 6, 7, and the Turnpike Division

    6 May, 2016

    GLE has served as the asbestos consultant for various FDOT districts throughout the State of Florida.

  • City of Cape Canaveral City Hall

    11 May, 2016

    GLE was selected to provide Architectural and Engineering Services for an approximate 18,000 square foot (SF) City Hall office building.

  • National Guard West Region Industrial Hygiene Assessments

    13 July, 2023

  • USACE Jacksonville Broward County Segment II – Endangered Species Act Coral Survey and Relocation Services

    13 July, 2023

    GLE was awarded the task order to perform diver based Endangered Species Act (ESA) coral relocations for the U.S. Army Corps of Engineers (USACE), Jacksonville District (SAJ).

Services

  • Indoor Environmental
  • Outdoor Environmental
  • Industrial Hygiene
  • Construction Consulting
  • Building Forensics
  • Property Condition Assessment
  • Catastrophe & Insurance Services
  • Architecture

Site Links

  • Home
  • Our Blog
  • About
  • Career Opportunities
  • Contact us
  • Locations

Learn More

Subscribe To The GLE Blog
  • This field is for validation purposes and should be left unchanged.
© 2022 GLE Associates, Inc. All Rights Reserved. AR 0007729; PE RY5483; Asbestos ZA 0000034; PG 1737
Design & Developed by TranquilBlue